ZONING AND SITE REQUIREMENTS SUMMARY
CAMPUS VILLAGE APARTMENTS

100 VARSITY LANE
DURHAM, NORTH CAROLINA

Prepared For:
ABC Student Housing Associates LLC
Date: Final - 5/01/2009
PZR SITE NUMBER: 12345-1


The Planning & Zoning Resource Corporation
100 NORTH EAST 5th STREET

OKLAHOMA CITY, OKLAHOMA 73104

(405) 840-4344

(405) 840-2608 FAX

ZONING AND SITE REQUIREMENTS SUMMARY

I. Property Location and Size

1. Jurisdiction: City of Durham


2. Name: Campus Village Apartments


3. Address: 100 Varsity Lane


4. Size: 5.80 Acres or 252,613 Square Feet +/-
(Phase II only)


II. Existing Land Use and Zoning

1. Date of Existing Ordinance: February 2007


2. Existing Zoning Designation: "R-12MF(CD)" Multi-Family Residential
Conditional Use District


3.Adjacent Zoning Designation and or Uses if Applicable: Not Applicable


4. Existing Land Use: 180 Unit Multi-Family Complex
Student Housing


Is The Existing Use in Conformance? Yes, as Permitted with Conditions of Development (see Attached)

III. Zoning Regulations

1. Are copies of zoning regulations available for this site? Yes, Attached
2. If any aspect of the property is not in conformance with current zoning, does the municipality provide ordinances dealing with non-conforming use? Yes, Attached
(For Information Only)

IV. Property Specification

1. Building Set-Back Lines
a. Front: 30 Feet
b. Side: 20 Feet
c. Rear: 40 Feet


Is The Existing Building in Conformance? Yes


2. Building Size
a. Maximum Building Height or Stories: 40 Feet or 3 Stories
b. Existing Building Height or Stories: 3 Stories
c. Building Site Area Requirements: 12,000 Sq. Ft. Minimum Lot Size


Is The Existing Building in Conformance? Yes


3. Density
a. Building Density Formula: 12 Dwelling Units per Acre (84 Units)
b. Approximate Building Footprint: 39,165 Square Feet (per Surveys)


Is The Building Coverage in Conformance? Yes, as Phase I and Phase II were developed as a 15.382 acre parcel with 180 total units, having a permitted density of 11.78 units per acre.


4. Parking
a. Parking Space Formula: Dormitories: 1 Space per 2 Residents
(336 existing beds, per Client)
b. Parking Spaces Required: 168 Total Parking Spaces
c. Existing Parking Spaces: 299 Total Parking Spaces
including 6 Handicapped Spaces


Is The Existing Parking in Conformance? Yes


V. Site History

1. Was special permitting or condition(s) applied to existing zoning? Yes
a. Site Plan Approval or Planned Unit Development? Site Plan Approval
(A copy is attached)
b. Other? None
2. Are there any outstanding building or zoning violations on file?
No, According to Bob Smith, Zoning Technician, there are no known Zoning Code violations at this location. See Attached Letter.
3. Is a Certificate of Occupancy available for the site?
Due to the age of the development copies of the Certificates of Occupancy for Phase II are no longer available. However, the Permit History for Building 9-15 are available online which indicates Certificates of Occupancy were issued May through June 1999, See attached print out. Please note, Certificates of Occupancy for projects developed prior to 1999 are no longer available. The absence of a Certificate on file with the City/County will not lead to any enforcement action affecting the subject property.

VI. Conclusions

1. Conformance Status: Legal Conforming
2. Nonconforming Characteristics of the Site: None
3. Recommended Action: None
3. Rebuildability Clause: Not Applicable
Other Comments: None

The Planning & Zoning Resource Corporation has relied on information provided by the following:

Municipal Officials
Bob Smith

Zoning Inspector

700 North Main Street

Durham, NC 28202

704-336-3568

Surveyor
Tim Allen

Plumb Bob Surveying

111 Center Drive

Moorseville, NC 28117

704-664-1111

Survey Dated: 3/21/2007


This report was prepared by David Anderson. Questions may be directed to David Anderson at 405.840.4344, Extension 3337 or by email to davida@pzr.com. Please reference PZR Site Number 12345-1.